Solar inverter shutting off on sunny afternoons? Grid overvoltage, the trip limits and the wire math
An inverter that drops to zero on bright, quiet afternoons and reconnects a few minutes later is usually protecting itself from high voltage at its own terminals. Under the IEEE 1547-2018 default settings, an inverter must stop exporting within 2 seconds once voltage reaches 110 percent of nominal, which is 264 V on a 240 V home service, and within 0.16 seconds at 120 percent. A California utility tariff allows the service voltage at the meter itself to sit as high as 252 V. The gap between those two numbers, 12 V, is the whole margin, and the wiring between your meter and your inverter spends part of it.
Most pages on this problem are forum threads, and many of the best-known explanations come from Australia and Europe, where homes run on 230 V and a different inverter standard sets the limits. This guide works the question in US terms: the service voltage band a utility actually commits to in its tariff, the default trip settings US inverters ship with, and the voltage rise in your own conductors, calculated from the National Institute of Standards and Technology's copper wire tables. It ends with an evidence log you can take to the utility or an electrician, and a table of who can fix which part.
If your system is low in other ways, such as low every day, low on one string, or low only in winter, start with the production shortfall diagnosis. This page is for one pattern only: full output, then nothing, then output again, clustered on the sunniest hours. An inverter that will not start at all until mid-morning after rain or heavy dew has a different problem, a leak to ground that the isolation fault guide covers.
Is it voltage? Read the shape of the dropout
Several different things can make a monitoring graph look wrong at midday, and only one of them is an overvoltage trip. The shape of the curve is the quickest way to tell them apart, before anyone opens a panel. An overvoltage trip produces a cliff: output falls from near its peak to zero for that inverter, stays there for a short period while the inverter waits to reconnect, then ramps back up. It happens most on clear days with low household demand, often on weekends and holidays when neighbours on the same transformer are also exporting and nobody is running air conditioning.
Inverters log the reason for every disconnection. The wording varies by manufacturer, but look for event names that mention grid overvoltage, AC voltage out of range, or grid voltage high. If the inverter or its app keeps a voltage history, export it; the log is worth more than any description of the problem, because it shows the voltage the inverter measured at the moment it stopped.
| What the graph shows | Most likely mechanism | What to check first |
|---|---|---|
| Output falls to zero at midday, returns within minutes, repeats on sunny days | Overvoltage trip: terminal voltage reached the inverter's trip setting | Event log for an overvoltage code; voltage history around each event |
| Output flattens into a level plateau at the same value every sunny day | Clipping: panels can make more power than the inverter is rated for | Inverter AC rating against the plateau; this is a design choice, not a fault |
| Output sags below the expected curve on high-voltage afternoons but does not hit zero | Volt-watt curtailment: a smart inverter function trimming real power as voltage rises | Whether volt-watt is active under your interconnection settings; voltage history |
| Some microinverters drop while others keep running | Each microinverter sees its own terminal voltage; those at the far end of the trunk cable see the most | Per-panel data for a pattern by position on the circuit |
| Output is zero all day, or zero from one date onward | A fault, an open breaker, or a failed inverter, not voltage | Breakers, the inverter's status screen, and the inverter replacement guide |
The three numbers that set your margin
Whether an inverter trips depends on three numbers stacked on top of each other: the voltage the utility delivers to your meter, the voltage your own conductors add between the meter and the inverter while it exports, and the trip setting inside the inverter. The first and third are written down in public documents. The second is arithmetic, and it is the one an owner can most often change.
The utility's number comes from its tariff. Pacific Gas and Electric's Electric Rule 2 (sheet 4, effective December 3, 2023) commits to operating its distribution circuits, under all normal load conditions, so that service voltage on a 120 V nominal service stays between 114 and 126 V, and on a 240 V nominal service between 228 and 252 V. The same rule lists exceptions: weather, infrequent short fluctuations, service interruptions, and causes beyond the utility's control. It also states that, for energy conservation, the utility regulates distribution voltages to the extent practicable to keep service voltages at the low end of the band. Other utilities publish their own service rules; the 114 to 126 V band on a 120 V base is the same Range A band the PG&E table reflects, and your own utility's rule is the document to read.
The inverter's number comes from the interconnection standard. The National Rural Electric Cooperative Association's guide to IEEE 1547-2018 reproduces the default trip values: the first overvoltage threshold, OV1, is 1.10 per unit of nominal voltage, and the second, OV2, is 1.20 per unit, the same thresholds as in the 2003 standard but with longer clearing times. OV2 must clear in 0.16 seconds in every category. OV1 must clear in 2 seconds for Category I and II equipment and 13 seconds for Category III. The guide adds that installations generally use these defaults unless the utility instructs otherwise, and many do: following the IEEE 1547a-2020 amendment, many utilities and ISO New England specify 2 seconds for Category III as well. Your interconnection approval states the setting that applies.
| Limit | Basis | On a 240 V service | On a 120 V basis |
|---|---|---|---|
| Utility minimum service voltage | PG&E Rule 2 | 228 V | 114 V |
| Utility maximum service voltage | PG&E Rule 2 | 252 V | 126 V |
| Volt-var: inverter starts absorbing reactive power | 103.0% of nominal (Rule 21 default V3) | 247.2 V | 123.6 V |
| Volt-var: full 30% reactive absorption | 107.0% of nominal (Rule 21 default V4) | 256.8 V | 128.4 V |
| OV1 trip, clears in 2 s (Category I and II) or 13 s (Category III) | 1.10 per unit (IEEE 1547-2018 default) | 264 V | 132 V |
| OV2 trip, clears in 0.16 s | 1.20 per unit (IEEE 1547-2018 default) | 288 V | 144 V |
Read the table from the top down and the problem becomes concrete. A meter sitting legally at 252 V leaves 12 V before the default OV1 threshold. Everything between the meter and the inverter's terminals, the service conductors inside your property, the interconnection breaker, and the run of wire to the inverter, raises the voltage the inverter sees while it pushes current out. If that rise plus the utility's voltage reaches 264 V for longer than the clearing time, the inverter must stop.
Why exporting pushes the voltage up
Current only flows from a higher voltage to a lower one. When your house imports power, the utility's side is higher and the voltage at your outlets sags slightly below the meter. When your panels export, the direction reverses: the inverter has to raise its own terminal voltage just above the grid's to push current out through the wires. The higher the current and the more resistance in the path, the bigger that difference, which is Ohm's law, voltage equals current times resistance, applied to every conductor between the inverter and the utility transformer.
That path has segments on both sides of the meter. On the utility side are the service drop or underground service lateral and the distribution transformer that serves your street. On your side are the service entrance conductors, the main panel, and the circuit from the interconnection point to the inverter. Neighbours matter too. When several homes on one transformer export at the same moment, they all push current back through the same transformer, and the voltage at every one of those homes rises together. That is why trips cluster on clear, mild weekends: high production, low demand, and many systems exporting at once.
The utility controls the starting voltage, and some feeders start high. The PG&E rule's commitment is to keep voltage within the band under normal load conditions; a feeder set high so that homes at the far end do not sag at peak demand can leave homes near the start of the circuit close to the upper limit on quiet afternoons. That is a utility question, and the evidence log later on this page is how to raise it.
The wire-rise arithmetic, from the NIST copper tables
The part of the rise inside your property can be calculated. On a 240 V split-phase circuit, the inverter's current flows out on one hot conductor and back on the other, so the resistance that matters is the conductor's resistance per foot times twice the one-way length. Multiply by the current, and the result is the voltage rise in that run.
The resistance values come from the National Institute of Standards and Technology's Copper Wire Tables, Handbook 100 (1966), Table 6, which lists ohms per 1,000 feet of standard annealed copper at temperatures from 0 to 200 degrees Celsius. Conductors carrying an inverter's full output on a summer afternoon run warm, so the calculation below uses the 75 °C column: 0.7639 ohms per 1,000 feet for 8 AWG, 0.4806 for 6 AWG, and 0.3022 for 4 AWG. The inverter is a 7.6 kW AC unit at full output on a 240 V service, which is 31.7 A.
| One-way run | 8 AWG copper | 6 AWG copper | 4 AWG copper |
|---|---|---|---|
| 50 ft | 2.42 V (1.0%) | 1.52 V (0.6%) | 0.96 V (0.4%) |
| 100 ft | 4.84 V (2.0%) | 3.04 V (1.3%) | 1.91 V (0.8%) |
| 150 ft | 7.26 V (3.0%) | 4.57 V (1.9%) | 2.87 V (1.2%) |
Two features of the table matter for a homeowner. Rise scales directly with distance, so an inverter mounted in a detached garage or at the far side of a ground-mounted array 150 feet from the panel spends three times the margin of one mounted beside the panel. And moving up one or two wire sizes cuts the rise sharply: at 150 feet, going from 8 AWG to 4 AWG removes about 4.4 V, more than a third of the 12 V margin. The calculation covers only the run you can see on the plan set. Loose or corroded terminations add resistance the table does not show, which is one reason an electrician measures rather than calculates when a problem appears after years of normal running.
A worked case: 250 volts at the meter
This illustration uses the figures above, with every input stated. It describes no particular home.
A home's meter reads 250 V on a clear Sunday afternoon, inside the 252 V ceiling in the utility's rule. The 7.6 kW inverter sits 100 feet away, fed by 8 AWG copper. At full output, the inverter's terminals sit about 4.8 V above the meter, roughly 254.8 V. That is well short of the 264 V OV1 threshold, so on these numbers the inverter keeps running. Under California's default smart inverter settings, it would already be absorbing some reactive power, because 254.8 V is above the 247.2 V point where the default volt-var curve begins.
Now change one input. Several neighbours export at the same time and the meter voltage climbs to 259 V, above the utility's band. The inverter sees about 263.8 V, a fraction of a volt below the trip line. A few more watts of export, a slightly warmer conductor, or one loose termination is enough to cross 264 V, and the inverter must stop within 2 seconds. Once it stops, its own contribution disappears, the voltage falls, the inverter waits and reconnects, and the cycle repeats. That on-off rhythm is the signature in the monitoring graph.
The lesson from the arithmetic: in this case the owner's wiring contributed under 5 V, and the decisive change was on the utility side. In another home, a 150-foot run of smaller conductor would make the owner's side the main contributor. Only measurements at both the meter and the inverter separate the two, which is why the evidence log comes before any fix.
Smart inverter settings: volt-var, volt-watt and why output may sag instead of trip
Modern inverters can do more than trip. IEEE 1547-2018 requires inverters to have voltage regulation capabilities, including volt-var and volt-watt functions, but leaves the decision to use them, and the settings, to the utility. The NRECA guide notes that, by default, the standard puts an inverter in fixed power factor mode at unity power factor, meaning no reactive power support unless the utility asks for it.
California went further. PG&E's Rule 21 advice letter 6635-E-C (submitted May 4, 2023, effective August 29, 2023) sets the default activation states for UL 1741 SB inverters: dynamic volt-var and volt-watt are both activated, and fixed power factor is deactivated. The default volt-var curve holds unity power factor between 97 and 103 percent of nominal voltage, ramps to 30 percent reactive power absorption at 107 percent, and injects reactive power at low voltage. Absorbing reactive power pulls the local voltage down without cutting the energy you produce, which can keep an inverter below its trip line on a marginal circuit.
Volt-watt works differently: as voltage rises, the inverter reduces its real power output. That prevents trips, but the energy is still lost; it just disappears more gradually, as a sag below the expected curve rather than a cliff to zero. An owner in a state with these settings active can therefore have a voltage problem without ever seeing an overvoltage event in the log. If the curve sags only on the brightest, quietest afternoons, ask whether volt-watt is active and pull the voltage history for those hours.
Build the evidence log before calling anyone
A utility will check your service against its rule; an electrician can check your side. The habit that makes this easy is the monthly monitoring check described in the solar maintenance routine: an owner who already reads the event log notices the pattern weeks earlier. Both work faster with data, and a few weeks of records usually settles which side the problem sits on.
- Export the inverter's event log and voltage history for every day with a dropout. Note the time of each event and the voltage the inverter recorded just before it.
- Record the conditions: weather, the time of day, and whether household demand was low. A cluster on clear, mild weekends points to export-driven rise.
- Ask a licensed electrician to measure voltage at the meter and at the inverter terminals at the same time, while the system is exporting near full output. The difference is your side's rise; the meter reading is the utility's side. Do not open the meter or the main panel yourself.
- Compare the meter reading with your utility's published service band. On PG&E's rule, anything above 252 V on a 240 V service is outside the normal-condition range.
- Check whether the dropouts started after a change: a neighbour's new system, utility work on the street, a battery or an expansion added to your own system, or an electrical repair.
- Report to the utility with the log attached. PG&E's voltage complaint process sends a field technician to check the service against Rule 2, may leave a recording volt meter for a few days if nothing is found at first, and has its voltage reliability team respond within 48 hours of receiving that meter data. The utility asks customers to say whether the complaint involves a solar system.
Who fixes which part
Once the measurements are in, the fix follows the side that owns the problem. PG&E's own page states both outcomes: if the high voltage is caused by customer-side generation, the utility notifies the customer of its findings and helps resolve the issue; if the service voltage is within the rule, it tells the customer the problem may be on the customer's side.
| Where the rise is | Typical remedies | Who acts |
|---|---|---|
| Utility service above its published band | Transformer tap change, voltage regulator settings, service conductor or transformer work | The utility, after its own measurement |
| Utility within its band but near the top, little rise on your side | Ask about volt-var settings or a revised setting approved under your interconnection agreement; ask whether the transformer serves many exporting homes | Utility and installer together |
| Large rise in your own conductors | Larger conductors, a shorter run, moving the inverter or the interconnection point closer to the service | A licensed electrician, often with a permit |
| Rise appeared suddenly after years of normal running | Inspect and retorque terminations; look for a damaged conductor or a failing breaker | A licensed electrician |
| Microinverters at the far end of a branch tripping first | Review branch length and trunk cable sizing against the manufacturer's installation documents | The installer |
One remedy is off the table for an owner: changing the inverter's trip settings on your own. The settings are part of what the utility approved when it let the system interconnect, and the NRECA guide describes default values staying in place unless the utility instructs otherwise. Any change goes through the utility and the installer, in writing. If the system is under a lease or PPA, the owner of the equipment handles it, and the contract's performance terms may apply; the ownership comparison explains who holds which obligation.
Raising the trip limit as the first fix
Forum threads often end with someone advising that the inverter's overvoltage setting be raised a few volts. In the US, that setting is part of the interconnection the utility approved, and changing it without the utility's agreement can breach that agreement. It also hides the evidence: if the utility's voltage is outside its own published band, raising your trip point lets the problem continue on the whole street. Measure first, report to the utility, and change settings only through the utility and installer, in writing.
What repeated trips cost
Overvoltage trips cost energy, not hardware, and the amount depends on how often they happen and when. A labelled illustration shows the scale. Suppose a system producing about 6 kW at midday loses a combined 90 minutes on each of 40 sunny days in a year. That is 6 kW times 1.5 hours times 40 days, or 360 kWh. Against a planning example of 11,000 kWh a year, it is about 3.3 percent of annual output. At a labelled 30 cents per kWh of avoided purchases it would be about $108 a year; if most of the lost energy would have been exported at a much lower credit, it is worth less, which is why your export rule decides the dollar value.
That cost is small enough that an expensive fix on the owner's side needs to be weighed against it, and large enough to justify the free steps: the evidence log, the utility complaint, and a check of terminations. The trips also distort any comparison with the production estimate. If you are measuring the system against its estimate or a production guarantee, keep the event log; the production estimate guide explains how a guarantee clause treats shortfalls, and whether grid-caused downtime counts is a question for the contract's exact wording.
Where the simple explanation breaks
- 208 V services. Some apartments, condominiums and small commercial buildings are served at 208 V from a three-phase system, not 240 V split phase. PG&E's rule gives 197 to 218 V for that service. An inverter must be configured for the service it is connected to, and a mismatch is an installer question, not a utility one.
- Battery systems. A battery charging from the panels at midday reduces export and can reduce voltage rise; a battery discharging to the grid adds to it. A trip pattern that changed after a battery was installed may reflect its operating mode. The guide to adding a battery to existing solar covers how coupling choices change what the inverter sees.
- Expansions. Adding panels or a second inverter raises export current on the same conductors, so a circuit that never tripped can start. The guide to expanding an existing system covers the interconnection checks an expansion triggers.
- Flickering lights or appliances behaving oddly. Lights that brighten and dim with load changes, or appliances failing, can indicate a loose neutral or another wiring fault, which is a safety problem rather than a solar setting. Call the utility and an electrician; do not wait for a monitoring pattern.
- Low voltage instead of high. Undervoltage events at the end of long rural feeders are a different problem with different trip settings; the same logging steps apply.
Overvoltage evidence checklist
- Export the inverter's event log and voltage history for each dropout day.
- Note the time, weather and household demand at each event.
- Have an electrician measure voltage at the meter and the inverter terminals simultaneously during full export.
- Compare the meter reading with your utility's published service voltage rule.
- Calculate your own conductor rise from the plan set using the NIST resistance values.
- Report to the utility with the log attached and say that the home has solar.
- Ask the installer whether volt-var or volt-watt is active and what your interconnection agreement allows.
Overvoltage questions owners ask
Why does my solar inverter shut off in the middle of sunny days?
The most common reason for a repeated midday shutdown that recovers on its own is high voltage at the inverter. Exporting raises the voltage at the inverter above the meter, and if the total reaches the default trip point of 110 percent of nominal, 264 V on a 240 V service, the inverter must stop within 2 seconds. The event log will name the reason.
What grid voltage is too high for a solar inverter?
Under IEEE 1547-2018 defaults, the first overvoltage threshold is 1.10 per unit, 264 V on a 240 V service, cleared in 2 seconds for Category I and II equipment, and the second is 1.20 per unit, 288 V, cleared in 0.16 seconds. Utilities can require other settings, so your interconnection approval is the document that states your inverter's actual limits.
Is my utility allowed to deliver 250 volts?
On PG&E's Electric Rule 2, yes: a 240 V service may run from 228 to 252 V under normal load conditions, with exceptions for weather, brief fluctuations and interruptions. Other utilities publish their own service voltage rules. A sustained reading above your utility's band is a reason to file a voltage complaint with your logged data.
Can I just raise the overvoltage setting on my inverter?
Not on your own. The trip settings are part of the interconnection the utility approved, and default values stay in place unless the utility instructs otherwise. A change goes through the utility and the installer in writing, after measurements show where the voltage rise comes from.
Will thicker wire stop the inverter tripping?
Only if your own conductors are a large part of the rise. On a 150-foot run carrying 31.7 A, moving from 8 AWG to 4 AWG copper cuts the rise by about 4.4 V according to the NIST resistance tables. If the meter voltage itself is near or above the utility's limit, the utility's side has to change, and wire alone will not solve it.
Why do only some of my microinverters drop out?
Each microinverter measures the voltage at its own connection. Units at the far end of a branch circuit see the trunk cable's rise on top of everything else, so they reach the trip point first. The per-panel data showing a pattern by position is useful evidence for the installer.
Sources and verification
- Pacific Gas and Electric Company, Electric Rule No. 2, Description of Service (sheets 4 and 5): Sheet 4 (Advice 7060-E, effective December 3, 2023): under all normal load conditions, service voltage on 120 V nominal between 114 and 126 V, 208 V between 197 and 218 V, 240 V between 228 and 252 V; for energy conservation, distribution voltages are regulated to the extent practicable to keep service voltages low within the band. Sheet 5: exceptions for temporary action of the elements, infrequent momentary fluctuations, service interruptions, temporary separation of parts of the system, and causes beyond the utility's control. Checked October 30, 2026.
- National Rural Electric Cooperative Association, Guide to the IEEE 1547-2018 Standard and Its Impacts on Cooperatives (March 2019): Tables 3 and 4: default overvoltage thresholds OV1 1.1 per unit and OV2 1.2 per unit for Categories I, II and III; clearing times OV2 0.16 s in all categories, OV1 2 s for Categories I and II and 13 s for Category III. A DER would generally be installed using the default values unless the utility instructs otherwise; by default, DER operates in fixed power factor mode at unity power factor; all DERs must have volt-var and volt-watt capability, with use and settings at the utility's discretion. The guide states it is not sanctioned or endorsed by the IEEE. Checked October 30, 2026.
- Pacific Gas and Electric Company, Advice Letter 6635-E-C, Electric Rule 21 smart inverter revisions (submitted May 4, 2023): Effective August 29, 2023. Table P-4 default activation states for UL 1741 SB inverters: dynamic volt/var activated, volt/watt activated, fixed power factor deactivated. Voltage and reactive default settings: V1 92.0% (30% reactive injection), V2 97.0% and V3 103.0% (unity power factor), V4 107.0% (30% reactive absorption); default open loop response time 5 seconds. Checked October 30, 2026.
- Pacific Gas and Electric Company, Report a voltage problem: A field technician checks whether service voltage complies with Electric Rule 2; a recording volt meter may be left for a few days; the voltage reliability team responds within 48 hours of receiving the meter data; customers are asked to state whether a PV system is involved; if high voltage is caused by customer-side generation, the utility notifies the customer and helps resolve it; if voltage is within limits, the problem may be on the customer side. Checked October 30, 2026.
- National Bureau of Standards (now NIST), Copper Wire Tables, Handbook 100 (February 1966): Table 6, standard annealed copper, ohms per 1,000 feet at 75 °C: 8 AWG 0.7639, 6 AWG 0.4806, 4 AWG 0.3022 (at 20 °C: 0.6281, 0.3952, 0.2485). Used for the conductor rise table on this page. Checked October 30, 2026.
The trip values on this page are the IEEE 1547-2018 defaults as reproduced by NRECA, and the service band and smart inverter settings are PG&E's; your utility and your interconnection approval may set different values. The conductor rise table is arithmetic for a stated current, length and temperature, not a design calculation, and conductor sizing under the electrical code is a licensed electrician's job. The lost-energy figures are a labelled illustration. Nothing here replaces a measurement at your meter and inverter.