State pages

Solar in Arizona

The strongest solar resource in the set and a history of policy swings on export compensation. The current tariff, not the sunshine, is the deciding document.

Start here in Arizona

  • Recorded programme: Arizona utility export compensation (Net billing / export rate). Export compensation is set utility by utility; for APS, TEP and UniSource it is set through Arizona Corporation Commission rate cases, while SRP sets its own rates through its elected Board. New rooftop customers are generally on export or net billing tariffs rather than legacy one-for-one net metering, per the DSIRE summary for Arizona.

Net-metering position: see the recorded programme type and status above, then confirm the export terms that apply at your address in your utility tariff.

Price it for my roof in Arizona →

The estimator link carries the Phoenix planning example for Arizona. Change the planning area inside the estimator if another listed metro is closer.

Independent directory, no paid listings

We are not paid by any installer or program listed here. There are no sponsored placements and no affiliate links. This directory is a free tool to help you compare your options.

Production and price context

What that production range means on a roof

Put Arizona's range on the standard 8 kW example. At 1,550 to 1,750 kWh per kW per year, the sunniest tier of the 13 states on this site, an 8 kW system produces roughly 12,400 to 14,000 kWh in its first year. The hardware price does not change at the state line: at the DOE Q1 2025 benchmark of $2.95 per watt, that system is $23,600 before incentives in every state. What changes is the value of a kilowatt-hour. At Arizona's average residential price, the year-one range is worth about $1,928 to $2,177 if every kilowatt-hour offsets a retail purchase, a simple payback of about 10.8 to 12.2 years with no federal credit and no incentive subtracted. At 15.55 cents, Arizona sits in the middle of this index: neither sun nor price carries the math alone. The export rule and the share of production you use yourself tip the decision, which is why two neighbours with the same roof can get different answers from the same quote.

Arizona export compensation is set through utility rate cases and differs by utility and vintage. So read every Arizona quote export-first. A kilowatt-hour you send out is worth less than one you use, and the production range above only pays in full on the share you consume yourself. Ask the installer what export value sits inside their payback, in writing, and check it against your tariff before you compare prices.

Hold installer promises against that 1,550 to 1,750 kWh per kW range. A promise above the top of it for any Arizona roof needs a named production tool, stated tilt and azimuth, and a shade analysis you can reproduce. A promise near the bottom on a clean south-facing roof deserves the same questions in reverse. The state range frames the conversation; the roof-specific model, with your tariff's export value inside it, settles it.

Simple payback on the standard 8 kW example, with every assumption printed

Run your own numbers with your actual bill and quote in the estimator, check how exports are priced in our net metering guide, and read the sizing guide before deciding how much of that 8 kW example your roof should actually carry.

Incentives and export rules to verify

Arizona export compensation is set through utility rate cases and differs by utility and vintage. Grandfathering rules have mattered here before; confirm what applies to a new system today in DSIRE and the utility tariff.

DSIRE's Arizona listing centers on the Renewable Portfolio Standard adopted by the Arizona Corporation Commission, which requires utilities to procure 15% of their energy from renewable sources by 2025, with 30% of that from distributed energy technologies. Arizona export compensation is set utility by utility through rate cases; new rooftop customers are generally on export or net billing tariffs rather than legacy one-for-one net metering, and grandfathering depends on system vintage. Confirm the export rate and demand charges that would apply to a new system in DSIRE and your utility's tariff (APS, TEP, UniSource, or SRP).

Policy summary source: DSIRE (Database of State Incentives for Renewables & Efficiency), dsireusa.org, accessed 2026-10-26. Program values are never printed here as guaranteed; name the program, then confirm its current value in DSIRE and your utility tariff.

Two sources decide what applies to your address today: DSIRE, the national database of state incentives for renewables and efficiency, for programs; and your utility's current tariff or residential solar page, for export compensation, fixed charges, and rollover rules. Program names and values change through legislation and rate cases, which is why this page tells you where to verify instead of printing a program value that could be stale on arrival.

Arizona in detail: utilities, policy history and program mechanics

Desert production, utility by utility export rules

Arizona has the strongest recorded resource in this batch, roughly 1,550 to 1,750 kilowatt hours per kilowatt per year in the desert metros, with a recorded EIA residential rate of 15.55 cents per kilowatt hour for 2025. DSIRE lists the predominant investor owned utilities as Arizona Public Service, the largest in the state, Tucson Electric Power for the Tucson metro, and UniSource, and describes Salt River Project separately as a private, self governed corporation serving the Phoenix area. Your address decides which export document controls your bill.

DSIRE also records the backdrop: in November 2006 the Arizona Corporation Commission adopted the current Renewable Portfolio Standard, requiring 15 percent of utility energy from renewable sources by 2025, with 30 percent of that from distributed energy technologies. That standard explains Arizona rooftop history, but it guarantees a new homeowner no export rate. New systems are generally on export or net billing terms set utility by utility, not legacy one for one net metering.

The Resource Comparison Proxy and the 10 year lock

For ACC regulated utilities, the export mechanism is the Resource Comparison Proxy. Tucson Electric Power states that the Arizona Corporation Commission approved the RCP for customers who requested interconnection since September 20, 2018, that it is based on average market costs for solar over a recent five year period, and that it is usually adjusted annually. Crucially, TEP states that customers are compensated for up to 10 years at the RCP rate in place when they requested interconnection, and that ACC rules bar a fall of more than 10 percent in a year.

TEP gives the worked example: an export rate of $0.0462 per kilowatt hour from October 1, 2026 through September 30, 2027, shown on the bill as an Excess Generation Credit. APS customers should not borrow that number. Ask APS for the RCP tranche applying to your application date in writing, confirm the 10 year lock, and ask whether your APS time of use plan carries a demand charge based on highest on peak use. A quote valuing exports at retail, or at an older tranche, is not modeling an Arizona ACC tariff.

Salt River Project is a different system

SRP homes do not follow the APS and TEP script, because SRP sets its own price plans. SRP states that its Customer Generation Price Plan keeps a demand charge based on the 30 minute interval during on peak hours when the home uses the most electricity in the month, while its newer Average Demand plan averages daily on peak maximum demands instead. SRP also states that its Time of Use Export and Electric Vehicle Export plans have no demand charge and credit excess generation.

On SRP's Electric Vehicle Export plan, SRP states that excess energy is credited instantly at a fixed rate of 3.45 cents per kilowatt hour, that on peak hours run weekdays from 2 to 8 p.m. from May to October and weekdays from 5 to 9 a.m. and 5 to 9 p.m. from November to April, and that super off peak hours run from 11 p.m. to 5 a.m. SRP notes this plan will be discontinued as of the November 2029 billing cycle. Verify in DSIRE and your SRP documents which plan you would be placed on, before sizing around exported power.

The order of decisions in Arizona

  1. Confirm the export rule and any minimum bill. That prices your surplus energy.
  2. Size the system against a year of bills and the export rule, using our sizing guide.
  3. Price at least three quotes against the $2.95 per watt DOE benchmark line in the estimator.
  4. Only then evaluate batteries, which pay through export value and rate spreads, per our battery guide.

What matters most here

The strongest solar resource in the set and a history of policy swings on export compensation. The current tariff, not the sunshine, is the deciding document. Start from that fact when you read quotes. Ask every installer to show the production tool behind their estimate, the export value inside their payback, and the incentive owner for every dollar subtracted from the price. If the answers name documents you can check in DSIRE or your tariff, you are having the right conversation. If they name deadlines and pressure instead, our quote red flags guide lists what to ask next.

Worked examples in Arizona

This site works the full benchmark example, end to end, for Phoenix. Each metro page states its production factor, example electricity price, first-year savings, and simple payback on the same 8 kW, $180-bill example used across the site, so the metro figures and this state context can be read together.

Sources and verification

Production ranges are planning factors summarized from National Renewable Energy Laboratory (NREL) PVWatts-style public material, checked October 4, 2026. Cost basis: U.S. Department of Energy Q1 2025 residential benchmark of $2.95 per watt DC (2024 dollars, checked October 30, 2026), used only as a comparison line. Electricity price: U.S. Energy Information Administration, Electric Power Monthly (average price by state), average price by state for 2025: 15.55 cents per kWh, verified 2026-10-26. Incentive and export policy summary: DSIRE (Database of State Incentives for Renewables & Efficiency), dsireusa.org, accessed 2026-10-26. Incentive status must be re-verified in DSIRE at decision time; export rules must be confirmed in your utility tariff. No federal residential credit is assumed; it ended for systems placed in service after 2025. No incentive value is promised on this page.