State incentives and net metering
Arizona utility export compensation
The export rate and any demand charges that apply to a new system differ by utility and by system vintage, and grandfathering depends on when the system was installed.
ArizonaNet billingExport rateUtility tariff
Independent directory, no paid listings
We are not paid by any installer or program listed here. There are no sponsored placements and no affiliate links. This directory is a free tool to help you compare your options. Listings are ordered by state, then alphabetically by program name, and payment does not affect that order.
Full record for this entry
| Program name | Arizona utility export compensation |
|---|---|
| State | Arizona |
| Program type | Net billing / export rate |
| Administering body | Arizona Corporation Commission for APS, TEP and UniSource; SRP sets its own rates through its elected Board and is not ACC-regulated |
| Status as the source states it | Export compensation is set utility by utility; for APS, TEP and UniSource it is set through Arizona Corporation Commission rate cases, while SRP sets its own rates through its elected Board. New rooftop customers are generally on export or net billing tariffs rather than legacy one-for-one net metering, per the DSIRE summary for Arizona. |
| What it covers | The export rate and any demand charges that apply to a new system differ by utility and by system vintage, and grandfathering depends on when the system was installed. |
| Incentive amount note | No dollar amount is recorded here. Each utility publishes its own export rate in its tariff. |
| Tags | Arizona, Net billing, Export rate, Utility tariff |
| Official source | Tucson Electric Power, Resource Comparison Proxy Export Rate |
| Checked date | 2026-10-29 |
Source note: DSIRE summary for this state, as recorded on this site from DSIRE on 2026-10-04 and re-checked for this directory on 2026-10-22 against official state, utility and program sources. Profile sections were added on 2026-10-26 from the official source above and the official pages cited in the text; every figure is attributed where it appears. Program terms change. Confirm the current status, eligibility and value for your address in the source above and in your utility tariff before you sign anything.
About this program: how it works
No single Arizona export rate: the Resource Comparison Proxy method
Arizona does not pay new rooftop exports at one statewide price. For Arizona Public Service, Tucson Electric Power, and UniSource, compensation is set utility by utility through Arizona Corporation Commission rate cases, using the Resource Comparison Proxy, or RCP, method. TEP states that the RCP is used for excess rooftop power, was approved for customers requesting interconnection since September 20, 2018, and is based on average market costs for solar over a recent five year period.
UniSource states the same idea: it buys excess rooftop output at a rate reflecting its average solar costs over the previous five years, under Rider 14. The proxy is a backward looking average of utility scale solar costs, not the retail price you pay.
APS and TEP rates, annual step downs, and the 10 year lock
TEP states that its export rate of $0.0462 per kilowatt hour remains in effect from October 1, 2026 through September 30, 2027, is usually adjusted annually, and cannot fall more than 10 percent annually under Commission rules. Customers are compensated for up to 10 years at the rate in place when they requested interconnection, shown as Excess Generation Credit, per TEP.
APS publishes the same structure by tranche in Rate Rider RCP: a rate for each annual tranche effective September 1, reducible by no more than 10 percent yearly, applicable for 10 years from interconnection. Its schedule lists $0.06857 per kilowatt hour for September 1, 2024 through August 31, 2025, $0.06171 for the next year, and $0.05554 for September 1, 2026 through August 31, 2027. Exports are metered instantaneously, per APS.
Per TEP and APS: TEP pays $0.0462 through September 30, 2027, and the APS September 1, 2026 tranche pays $0.05554, each locked 10 years.
Grandfathering, time of use, and what happens after the lock
UniSource states that existing customers were allowed to continue net metering for 20 years from connection, and should expect a transition at 20 years. Customers transitioning to the RCP rate must also take service under a time of use plan, with higher rates when use is highest, per UniSource.
The APS schedule states that after the initial 10 years, the credit is based on the purchase rate then in effect, which may change yearly. Model the first 10 years at your locked rate, and later years at a moving rate.
SRP is separate: an elected board and customer generation plans
Salt River Project is not regulated by the Arizona Corporation Commission for these rates. It sets its own rates through its elected board, and customers choose among customer generation plans. SRP states that its Time of Use Export Price Plan has no demand charge, credits exports at a fixed 3.45 cents per kilowatt hour, and tracks delivered and exported energy instantaneously, which it distinguishes from net metering. It states the same rate, with no demand charge, for its Electric Vehicle Export Price Plan.
Other SRP plans differ. SRP states that, as of the May 2026 billing cycle, its Manage Demand plan export rate is $0.0187 per kilowatt hour, recalculated annually each May, with a demand charge based on 60 minute on peak intervals. On February 27, 2025 its publicly elected Board approved retiring select plans, and the two export plans above will be discontinued as of the November 2029 billing cycle, per SRP.
Compare the quotes this program affects