Will adding panels, a battery or a new owner cost you your grandfathered net metering?
A battery generally does not end legacy net metering, but panels can. Under PG&E's NEM2 tariff you may add the greater of 10 percent of the original nameplate or 1 kW; go past that and the whole system can be moved to net billing. The legacy status stays with the system when the home sells, in California and Idaho, and in Illinois per the program administrator's guidance, so long as the system stays where it is.
That one paragraph hides most of the money. A grandfathered system is valued at a rate that new systems can no longer get, so the status is an asset, and it is an asset that a careless permit can destroy. Installers selling an add-on do not always say which tariff the add-on would trigger, and a buyer of a house with older panels rarely asks which rate plan those panels are locked into. This guide walks through the actual rule text so that you can ask for the right answer in writing before you spend the money.
The rules differ by utility and state, so the guide works from three primary documents instead of one generalization: the Pacific Gas and Electric NEM2 tariff and the California Public Utilities Commission decision behind it, the Idaho Public Utilities Commission order that created legacy treatment for Idaho Power customers, and the Illinois net metering transition as described by the Illinois Power Agency's program administrator. Each is dated and linked in the source box. For the general mechanics of net metering, net billing and buyback, start with the net metering explainer; for how California's successor tariff works, read the California net billing guide. Everything else sits in the export compensation hub.
Nothing here is legal or tariff advice. Tariffs are revised by commissions, and the sheet that governs your account is the one your utility holds, so treat the tables as a map of the questions to ask and confirm each answer against your own interconnection agreement.
What grandfathering protects, and what it does not
Regulators created the older net metering tariffs when solar was a small niche. When they replaced those tariffs with less generous ones, they promised the people who had already invested that they could keep the old terms for a defined period. That promise is called grandfathering in some places and legacy treatment in others. It is a promise about a rate structure: how your exports are credited against your imports. It is not a promise about the rest of your bill, and it is not a promise that survives every change you make to the hardware.
Three separate questions decide whether you keep it. The first is the clock: how many years the protection lasts and when it starts. The second is the perimeter: how much you may change the system before it counts as a new system. The third is the owner: whether the protection belongs to you personally or to the equipment on your roof. Most expensive mistakes come from assuming the answer to the second and third questions is the same as the answer in another state.
The Idaho Public Utilities Commission put the underlying principle bluntly in Order No. 34854, issued December 1, 2020: "tariffs are not contracts and are subject to change." The California commission, in Decision 22-12-056, concluded that it had the authority to revise the older tariffs and chose to leave them intact. Both statements matter. Grandfathering is a regulatory decision that can be narrowed in a later proceeding, which is one reason to avoid spending money on the assumption that it will last forever.
- The clock is set from a specific date in your paperwork, such as the day the utility granted permission to operate, and it is not reset by routine repairs.
- The perimeter is usually a size limit on how much capacity you can add, measured against the nameplate as it stood when the system was first connected.
- The owner question is answered in tariff text, and in the three places covered here the answer is that the status follows the system rather than the person.
California under PG&E's NEM2 tariff, rule by rule
California is the best-documented case, because the tariff text is public and the commission decision that closed the program is on the record. The rules below come from PG&E's Electric Schedule NEM2, Special Condition 8 (NEM2 Legacy Provisions), as published in the tariff book and checked on October 22, 2026. The relevant sheets carry an effective date of January 22, 2025 (Advice 7489-E). Southern California Edison and San Diego Gas & Electric have their own schedules; their sheets were not read for this guide, so a customer of either should ask for the matching clause rather than assume it reads the same.
The closing of NEM2 itself is covered in the California net billing guide. In brief, interconnection applications submitted after April 14, 2023 go to the Net Billing Tariff, and customers who were already in before that date keep the older terms for a limited legacy period. The decision that made that choice, D.22-12-056, adopted December 15, 2022, concluded that the NEM 1.0 and NEM 2.0 tariffs "should remain intact."
The 20-year clock starts at permission to operate
Special Condition 8.a gives NEM2 customers service on the schedule for 20 years from the date PG&E originally granted permission to operate, running through the end of the billing period that ends on or after the 20th anniversary. The tariff's own example: a customer who first received permission to operate on April 1, 2018 stays eligible through the conclusion of the relevant period ending on or after March 31, 2038. The date that matters is therefore the original permission to operate letter, which is worth locating now and filing with the house documents.
A customer who moved from the older NEM schedule to NEM2 did not get a fresh 20 years. The tariff says such a customer continues from the original permission to operate date and cannot restart the transition period. At the end of the period the customer moves to the Net Billing Tariff.
The expansion allowance: the greater of 10 percent or 1 kW
Special Condition 8.b says a generating facility that is modified or repaired remains eligible for the rest of its 20 years as long as the change does not increase the facility by more than the greater of two numbers: 10 percent of the nameplate capacity as established when the facility was originally interconnected, or 1 kW. A further condition appears in the same clause: the modification must not leave the system larger than the customer's annual onsite load.
Because the larger of the two numbers applies, any system under 10 kW gets a 1 kW allowance, and a system of 10 kW or more gets 10 percent. A 4 kW system may grow by 1 kW, which is 25 percent. A 12 kW system may grow by 1.2 kW. The allowance is measured against the original nameplate, so ask your utility whether earlier additions count against it; the tariff text does not say that a second small addition resets the baseline, and a cautious reading is that the cap is cumulative from the original figure.
What happens if you go past the limit
A footnote to the same clause gives two options for an addition that exceeds the limit. The first is to interconnect the addition separately under another eligible tariff, with Rule 21 non-export given as the example; in that case the original 20-year or 9-year transition period is not altered. The second is to have the entire system served under the Net Billing Tariff. A customer who makes that choice becomes eligible for the same 9-year legacy period as a new net billing customer, and for the 9-year export rate lock and the ACC Plus adder tied to the calendar year the upgraded system received permission to operate.
PG&E's public Solar Billing Plan page puts the consequence in one sentence: customers who "modify or expand their legacy NEM/NEM2 system above the tariff threshold levels" move to the Solar Billing Plan at their annual true-up date. The thresholds it names match the tariff: 10 percent of original nameplate or more than 1 kW. What lands on that settlement statement is walked through in the true-up bill guide.
Non-export additions and the departing load wrinkle
The non-export route is real and, according to PG&E, widely used. In Advice Letter 7915-E, filed May 22, 2026, PG&E reports nearly 2,500 applications for what it calls NEM Non-Export Expansion projects since the sunset, and describes them as residential systems of 30 kW or less where a customer adds non-export capacity above the modification threshold and stays on NEM or NEM2 because the added capacity cannot send power to the grid. The letter says the additions need a certified power control system.
The same letter shows the cost of that route. Non-export generation is subject to PG&E's departing customer generation schedule, which carries nonbypassable charges for the load the new array serves. The advice letter proposes a default billing method, Option 5, that estimates the departing load from the added capacity. The letter is a utility filing, not a commission decision, and its status after filing was not checked, so read it as a description of how the route works in practice and a warning that the added array comes with a billing line the original array never had. Ask for that charge in writing, per month, before you sign.
Adding a battery
Special Condition 8.b also addresses storage directly. Citing D.22-12-056, it says the addition of energy storage to the existing generating facility shall not disqualify the customer from the remainder of the 20-year transition period. There is one exception with a date attached: a customer who adds storage through the Self-Generation Incentive Program and has a reservation accepted on or after June 4, 2024 is required to move to the Net Billing Tariff under D.24-03-071. Three SGIP budget categories are exempt from that requirement: Residential Solar and Storage Equity, low-income qualified Equity Resiliency residential, and San Joaquin Valley Residential.
In plain terms, a battery paid for without an SGIP incentive does not trigger the move. A battery paid for with an SGIP incentive reserved on or after June 4, 2024 does, unless it falls in an exempt category. Whether the incentive is worth that trade is a question for your own numbers. The sibling guide on adding a battery to existing solar covers coupling choices, permits and the economics of the battery itself; this guide only settles what the battery does to your tariff.
Selling the house or changing the account holder
Special Condition 8.c says a facility eligible for the 20-year transition period does not lose eligibility if it is transferred to a new owner, operator or PG&E account, provided it remains at its original location. A footnote adds the other half: moving an existing facility to a new location is treated as a new installation requiring a new interconnection agreement under whatever tariffs apply when that request is completed.
So the legacy status passes to the person who buys the house, for the years that remain on the clock. This is different from the successor tariff. Under D.22-12-056, the net billing lock is tied to the original customer rather than the system, a difference the net billing guide covers in full. If you are buying a house with panels installed after April 14, 2023, do not assume the older, system-tied rule applies; ask which tariff the system is on.
A cheat sheet for common changes to a California legacy system
The table maps everyday projects onto the PG&E text. Each row states the rule and what to ask your utility; none replaces a written answer from the utility about your own account.
| Change | What the tariff text says | Question to ask before you proceed |
|---|---|---|
| Replace a few failed panels with the same wattage | A repair that does not increase capacity leaves the status intact. | Does the interconnection record need an update, and is the nameplate unchanged? |
| Replace panels with higher-wattage modules | Allowed while the total stays within the greater of 10 percent of original nameplate or 1 kW, and not above annual onsite load. | What is my original nameplate in kW on the interconnection record, and is the cap measured in DC or AC? |
| Add a few panels | Same allowance. Beyond it, the addition can go separately on a tariff such as Rule 21 non-export, or the whole system moves to net billing. | Does a previous addition count against the allowance? |
| Add a large new array | Over the limit. Either non-export (original period unchanged, departing load charges apply) or whole system to the Net Billing Tariff with a fresh 9-year period. | What is the monthly departing load charge in writing, and what would the whole system earn under net billing? |
| Add a battery without SGIP | Does not disqualify the customer from the remaining transition period. | Will the battery be allowed to charge from the grid or export, and does the permit change anything on my tariff? |
| Add a battery with an SGIP reservation accepted on or after June 4, 2024 | Customer must transition to the Net Billing Tariff, except in three exempt SGIP categories. | Which SGIP budget category is my application in? |
| Sell the house | Eligibility transfers with the facility if it stays at its original location. | How many years remain on the clock from the original permission to operate date? |
| Move the panels to a new house | Treated as a new installation under the tariffs in force at that time. | Which tariff would the relocated system receive today? |
Idaho: legacy treatment tied to the system at the meter
Idaho Power moved new on-site generation customers from retail net metering to net billing, and the Idaho Public Utilities Commission protected the people already in. The order that explains the terms in the most usable detail is Order No. 34854 in Case IPC-E-20-26, issued December 1, 2020. It dealt with commercial, industrial and irrigation customers, and it states that those customers receive the same terms the commission had given residential and small general service customers in an earlier case, IPC-E-18-15. That sentence is the reason the order is a useful window onto the residential rules. The residential orders themselves were not retrievable in this run, so treat the residential terms below as described in Order 34854 rather than read from the original.
As Order 34854 describes them, the terms are: a long period of 25 years from the order's service date for the commercial customers, the grandfathered status "stays with the system at the meter site," the status is forfeited if the system is offline for more than six months or is moved to another site, and the customer may increase capacity by no more than 10 percent of the originally installed nameplate capacity or 1 kW, whichever is greater, to allow for replacement of degraded or broken panels. The order adds that if a customer expands beyond those limits, "the new portion of their system would not qualify for legacy treatment."
That last sentence is different from California. In Idaho the legacy status covers the old portion of the system and the new portion is treated as new. In California, the PG&E footnote offers a choice between a separate tariff for the addition and moving the entire system to net billing. The distinction matters for the economics, because in Idaho you keep the old array's credit and the new array earns the current, lower credit, while in California a separate non-export addition keeps the old array unchanged but cannot export at all; the controls and approval screens such an addition must meet are set out in the guide to zero-export interconnection.
What the difference is worth in Idaho
Idaho Power's own customer brochure, which carries a 2026 copyright, states that net energy metering compensates exports with a one-for-one kilowatt-hour credit and applies to customers with legacy systems. For everyone else the brochure lists export credit rates by season and time of day, effective October 1, 2025: in the summer, 15.6836 cents per kilowatt-hour on peak and 3.3920 cents off peak; in the non-summer months, 2.9019 cents off peak. It adds that Idaho Power will file a proposed update to the export credit rate on April 1, 2028. A legacy system that exports in the afternoon and early evening is therefore credited at a retail-offset value, not at a few cents.
The brochure also lists what counts as a modification that must go through the interconnection process with a new application: adding or replacing solar panels or generation equipment, replacing an inverter, or adding batteries. It does not say that a battery ends legacy status, and the order text cited above does not list batteries among the forfeiture triggers. It does say that an account with a disabled system is removed from the on-site generation pricing schedule after six months, which matches the six-month offline rule in the order. If your inverter dies in winter, replace it promptly.
Illinois: lifetime of the system, with a different expansion test
Illinois ended full retail-rate net metering for new customers on January 1, 2025. Customers registered before that date keep it, and the Illinois Power Agency's program administrator, which runs the Illinois Shines program, answers the questions in an FAQ dated July 26, 2024. That document is an administrator's guidance, not a statute, and the official statute text on the General Assembly site could not be read in this run because of a certificate error. A search listing for the statute page also indicated a later amendment by Public Act 104-458 that this guide did not read. Check the current statute and your utility tariff before relying on the details below.
As the administrator describes it, systems registered for full retail net metering before January 1, 2025 continue to receive it for the lifetime of the system, regardless of whether the customer changes electricity providers or whether the customer receiving the benefit from the system changes. Asked whether a project with full retail net metering loses it on a change of ownership, the FAQ answers no: the net metering services stay with the system itself. It gives the same answer to a customer who buys out a leased or power purchase agreement system, so a lease buyout does not cost the system its legacy rate.
Where the lines are drawn for expansion
Illinois draws the expansion line by utility. According to the FAQ, a ComEd system loses its legacy status if the change requires a new interconnection application, and an Ameren system loses it if the nameplate capacity increases by more than 100 percent. Those are very different tests. In ComEd territory almost any addition requires a new application, so the safer assumption is that adding panels ends the status. In Ameren territory, a system could in principle double before the test is met. MidAmerican has its own rule, and the FAQ says its test is whether a completed net metering application was submitted before January 1, 2025.
A second condition is easy to miss. The FAQ says a customer who requested a Distributed Generation rebate from the utility in 2024 was not eligible for full retail net metering and receives supply-only net metering instead. If you are buying a house in Illinois with panels, find out whether the previous owner took that rebate, because the answer decides which tariff the system is on.
The three places side by side
The table collects the answers to the three questions from each source. It is a map of what was found, not a complete survey; other utilities and states have their own rules, and several carry no grandfathering at all.
| PG&E, California (NEM2) | Idaho Power (legacy systems) | Illinois (ComEd, Ameren, MidAmerican) | |
|---|---|---|---|
| Length of protection | 20 years from the original permission to operate date | 25 years from each order's service date (Order 34854 sets the term for commercial systems, and says residential terms are the same) | The lifetime of the system, per the program administrator |
| Expansion allowance | Greater of 10 percent of original nameplate or 1 kW, and not above annual onsite load | Greater of 10 percent of original nameplate or 1 kW, per Order 34854 | ComEd: no new interconnection application required. Ameren: nameplate increase of 100 percent or less. |
| Past the limit | Separate tariff for the addition (such as Rule 21 non-export), or whole system moves to net billing | New portion does not qualify for legacy treatment | Whole system loses the full retail rate |
| Battery | Does not disqualify. SGIP-funded storage reserved on or after June 4, 2024 moves the system to net billing, with three exempt categories | Brochure lists batteries as a modification needing a new application. Order 34854 does not list batteries as a forfeiture trigger. | Not addressed in the sources read; ask the utility |
| New owner | Eligibility transfers if the facility stays at its original location | Status stays with the system at the meter site | Stays with the system, including after a lease or PPA buyout |
| Moving the system | New installation under current tariffs | Status forfeited if moved to another site | Not addressed in the sources read |
| Offline system | Not addressed in the clauses read | Forfeited after more than six months offline | Not addressed in the sources read |
Buying or selling a house with a legacy system
If the status transfers with the system, it has a value that belongs in the sale conversation. The way to convert it into a number is to compare what the system earns on the legacy tariff with what the same system would earn on the tariff a new system gets today, then multiply by the years left on the clock. That gives a buyer a reason to pay for the panels, and a seller a reason to document them. The framework for pricing it, with the usual cautions about appraisals and leased equipment, sits in payback if you move or sell, and the leased-equipment version is in the guide on selling a house with leased solar.
The paperwork that proves the status is short. It is the permission to operate letter (for the start date of the clock), the interconnection agreement (for the original nameplate and the tariff), a recent bill that names the rate schedule, and a record of any modification since. If an addition was made, the interconnection record should show that it fit inside the allowance or went on a separate tariff. A buyer who cannot get these documents is buying an assumption.
- Sellers: put the permission to operate date, the tariff name and the remaining years into the listing packet, and say plainly whether any addition was made.
- Buyers: ask the utility, not the seller, which schedule the account is on, and whether the transfer of the account triggers any review. Do not assume a system installed after the older tariff closed has any legacy period at all.
- Leased systems: the lessor decides most changes, so a buyer taking over a lease should ask whether the lease permits additions and who bears the cost of losing the tariff.
How long the protection can be relied on
Grandfathering is a bet on regulatory stability. In California, the commission's 2022 decision records that parties argued for moving older customers onto the successor tariff after eight years, and the commission declined. It explained that although it had the authority to revise the older tariffs, doing so would create an inequity for one group of ratepayers or the other, and it left the older tariffs intact. In Idaho, the commission said that legacy treatment is "only appropriate in limited circumstances" and gave the reason it applied: customers who made a significant investment relying on program stability.
Two practical consequences follow. First, a date in the tariff is the best available evidence of how long the protection lasts, but a future commission could change it. Second, the protection pays for itself fastest when the system's cost is recovered early. A system that pays back in ten years on the legacy rate has its investment covered before most of the clock has run, and the remaining years are a bonus. A purchase decision that only works if the legacy rate lasts the full term should be examined with extra care. Where rates themselves are the question, the rate context sits on EnergyBS; the time-of-use rates guide there explains the rate plans that determine how much an export credit is worth in the first place.
Worked example: add 3 kW to a 6 kW legacy system
Inputs. A 6.0 kW system that received permission to operate in 2019 on PG&E's NEM2 schedule, so about 13 of its 20 years remain in 2026. It produces 1,400 kWh per kW per year, or 8,400 kWh, and exports 40 percent, or 3,360 kWh. The homeowner wants to add 3 kW. Prices are round illustrations, not tariff values: 30 cents per kilowatt-hour for the value of an export credited at the retail rate, 8 cents for an export under net billing, and $2.95 per watt for the added array, this site's comparison line from the U.S. Department of Energy's Q1 2025 residential benchmark (modeled market price for an 8 kW system, 2024 dollars, checked October 30, 2026), which gives $8,850.
The allowance. 10 percent of 6.0 kW is 0.6 kW, and 1 kW is larger, so the allowance is 1.0 kW. A 3 kW addition exceeds it by 2 kW. The only way to stay inside the allowance is a 1 kW addition.
Route A: add 3 kW as non-export. The new array produces 4,200 kWh. Because it cannot export, assume 80 percent is used on site, or 3,360 kWh, worth 3,360 x $0.30 = $1,008 a year in avoided purchases. Simple payback is $8,850 / $1,008 = 8.8 years, before any departing load charge, which adds a monthly cost that this example does not price.
Route B: move all 9 kW to net billing. The existing 6 kW array loses its legacy export credit. Its 3,360 kWh of exports fall from $1,008 to $269 at 8 cents, a loss of about $739 a year. The new array's 4,200 kWh is assumed half used on site at $0.30 ($630) and half exported at $0.08 ($168), for $798. Net gain: $798 minus $739, about $59 a year. Over the 13 remaining legacy years the existing array alone would have earned about $9,607 more on the legacy tariff than under net billing ($739 x 13), which is more than the $8,850 cost of the new array.
What it shows. On these inputs, moving everything to net billing wipes out nearly all of the benefit of the larger system, while the non-export route pays back in under ten years. Change the retail price, the export price, the self-consumption share or the departing load charge and the answer moves; the structure of the comparison does not. A real household should run it with its own bill, which the estimator and the payback method page can help set up.
Four ways legacy status gets lost by accident
Letting the installer file the application without asking which tariff it triggers. The interconnection application is the legal event. Whether a few extra panels, a larger inverter or a repowered array becomes a new system is decided by what the form says, not by what the crew believes. Ask for the tariff name and the post-change nameplate in writing before work starts.
Measuring the allowance against the wrong number. The PG&E clause refers to nameplate capacity as established when the facility was originally interconnected. A roof that has had two additions since may already be at the limit. And a panel swap that raises wattage by a few watts per module can add up to kilowatts across the array.
Forgetting the offline rule. Idaho Power treats a system offline for more than six months as having forfeited its status. A failed inverter that sits through a winter of indecision can cost more than the inverter.
Assuming the next owner inherits the same tariff you have. The sources read say the status follows the system. That is not true of every tariff, and the successor tariff in California ties its 9-year period to the customer.
Before you change, sell or buy a legacy system
- Find the permission to operate letter and write down the date. Add 20 years for California, or check the term your own utility's order gives.
- Find the original interconnection agreement and write down the nameplate capacity at first interconnection, noting whether it is stated in DC or AC.
- List every change made since: panel swaps, additions, inverter replacements, batteries. Note which ones went through the utility.
- Before any new work, ask the utility in writing whether the change keeps the account on its current schedule, and keep the answer.
- If a battery is funded by a state incentive, ask whether the incentive carries a tariff condition, as the California SGIP does for reservations accepted on or after June 4, 2024.
- For a sale, assemble the clock date, the tariff name, the remaining years and a statement of any additions, and hand them to the buyer's side early.
- Set a reminder for the date the legacy period ends, and compute in advance what the system earns on the successor tariff.
Questions about keeping a legacy net metering rate
Does adding a battery cancel NEM 2.0 in California?
Not by itself. PG&E's NEM2 tariff states that adding energy storage to an existing generating facility does not disqualify the customer from the rest of the 20-year period. The exception is a battery funded through the Self-Generation Incentive Program with a reservation accepted on or after June 4, 2024, which requires a move to the Net Billing Tariff unless the project is in one of three exempt categories.
How many panels can I add to a grandfathered system?
Under PG&E's NEM2 tariff the limit is the greater of 10 percent of the original nameplate or 1 kW, and the system must not exceed annual onsite load. Idaho's commission order describes the same 10 percent or 1 kW figure. Illinois uses different tests: ComEd looks at whether a new interconnection application is needed, and Ameren at whether nameplate rises by more than 100 percent.
Can I add more panels another way and keep my old rate?
In California, the tariff footnote allows the addition to be interconnected separately under another eligible tariff such as Rule 21 non-export, leaving the original period unchanged. The added array then cannot send power to the grid, and PG&E's May 2026 advice letter indicates it carries departing load billing. Whether the trade is worthwhile depends on how much of the new output you would use on site.
If I buy a house with older solar panels, do I get the old net metering rate?
In the PG&E, Idaho Power and Illinois materials read here, yes, provided the system stays at its location and the rest of the conditions hold. A system whose legacy period belongs to the original customer, as California's 9-year net billing period does, is different. Ask the utility which tariff the account is on and how many years remain.
What happens if my grandfathered system stops working for months?
In Idaho, a system offline for more than six months forfeits legacy status, and Idaho Power says accounts with disabled systems are removed from the on-site generation pricing schedule after six months. The California and Illinois sources read did not state an equivalent rule, so ask your utility rather than assuming there is none.
Does buying out a leased system change my net metering?
In Illinois, the program administrator says a system that received full retail net metering before January 1, 2025 keeps it when ownership changes, including when a lease or power purchase agreement system is purchased. For other utilities, read the lease and the tariff before agreeing to a buyout date.
What happens when the 20 years are up?
On PG&E's NEM2 tariff the customer moves to the Net Billing Tariff at the end of the period, and the successor tariff does not give the ACC Plus adder to customers moving over at the end of a legacy period. Plan the numbers for that year in advance, as covered in the California net billing guide.
If you are weighing a specific addition on a California system, run the two routes in the worked example with your own bill, then read the battery retrofit guide to see whether storage can deliver the benefit you wanted without touching the panel count.
Sources and verification
- PG&E Electric Schedule NEM2, Special Condition 8 (NEM2 Legacy Provisions): 20-year transition period from permission to operate; modification limit of greater of 10 percent or 1 kW; storage clause and SGIP exception; transferability; footnotes on separate tariff and relocation. Sheets effective January 22, 2025 (Advice 7489-E). Tariff PDF fetched directly and text extracted. Checked October 22, 2026.
- California Public Utilities Commission, Decision 22-12-056 (December 15, 2022): NEM 1.0 and NEM 2.0 tariffs to remain intact; commission authority to revise; 9-year net billing legacy period tied to the customer, with legal-partner exception. Checked October 22, 2026.
- PG&E, Solar Billing Plan page: Statement that legacy systems expanded above the threshold move to the Solar Billing Plan at the annual true-up. The page shows no revision date. Checked October 22, 2026.
- PG&E Advice Letter 7915-E (filed May 22, 2026): Description of NEM Non-Export Expansion projects, the 1 kW or 10 percent threshold, about 2,500 applications, and proposed departing load billing Option 5. A filing; its disposition was not checked. Checked October 22, 2026.
- Idaho Public Utilities Commission, Order No. 34854, Case IPC-E-20-26 (December 1, 2020): Legacy treatment terms: status stays with the system at the meter site; forfeited if offline over six months or moved; capacity increase limit of 10 percent or 1 kW; new portion not covered; 'tariffs are not contracts'. The earlier residential orders (IPC-E-18-15) were not retrieved. Checked October 22, 2026.
- Idaho Power, customer generation consumer information brochure: Net energy metering described as applying to legacy systems; modification list including batteries; six-month offline rule; export credit rates effective October 1, 2025; next proposed update April 1, 2028. Checked October 22, 2026.
- Illinois Shines Program Administrator, FAQs related to changes in net metering in Illinois (July 26, 2024): January 1, 2025 cutoff; lifetime of the system; change of ownership; ComEd and Ameren expansion tests; Distributed Generation rebate effect. Administrator guidance, not statute; the statute text on the General Assembly site could not be fetched. Checked October 22, 2026.
- U.S. Department of Energy, Solar Photovoltaic System Cost Benchmarks (Q1 2025): Table 2, 2025Q1 PV-only benchmarks: residential 8 kW DC system, modeled market price $2.95 per watt DC, 2024 dollars; used only as a comparison line in the worked example, per this site's standard. Checked October 30, 2026.
This guide reports what specific tariffs, orders and administrator guidance said when they were read on the check date. Utilities and commissions amend tariffs, other utilities in the same state differ, and no part of this page is legal, tax or tariff advice. The worked example uses round illustrative prices, not tariff values, and no federal residential credit is assumed anywhere on this site.