State incentives and net metering
Ohio net metering and net billing
Confirm your utility current net billing credit and interconnection terms in the PUCO-approved tariff before valuing exports. Surplus is not credited at the full retail price.
OhioNet meteringNet billingSystem size cap
Independent directory, no paid listings
We are not paid by any installer or program listed here. There are no sponsored placements and no affiliate links. This directory is a free tool to help you compare your options. Listings are ordered by state, then alphabetically by program name, and payment does not affect that order.
Full record for this entry
| Program name | Ohio net metering and net billing |
|---|---|
| State | Ohio |
| Program type | Net metering / net billing |
| Administering body | Public Utilities Commission of Ohio (PUCO) approved tariffs; your utility |
| Status as the source states it | Ohio rules set a maximum system size at 120% of a customer average yearly usage, per the DSIRE summary for Ohio. Net excess generation crediting changed from the full retail rate to the unbundled generation rate under the history recorded in that summary. |
| What it covers | Confirm your utility current net billing credit and interconnection terms in the PUCO-approved tariff before valuing exports. Surplus is not credited at the full retail price. |
| Incentive amount note | No dollar amount is recorded here. The credit basis is the unbundled generation rate in your tariff. |
| Tags | Ohio, Net metering, Net billing, System size cap |
| Official source | Ohio Administrative Code Rule 4901:1-10-28, Net metering (PUCO rules) |
| Checked date | 2026-10-29 |
Source note: DSIRE summary for this state, as recorded on this site from DSIRE on 2026-10-04 and re-checked for this directory on 2026-10-22 against official state, utility and program sources. Profile sections were added on 2026-10-26 from the official source above and the official pages cited in the text; every figure is attributed where it appears. Program terms change. Confirm the current status, eligibility and value for your address in the source above and in your utility tariff before you sign anything.
About this program: how it works
History: from full retail credit to the unbundled generation rate
Ohio original net metering law was passed in 1999 as part of electric industry restructuring, per DSIRE. At first, the Public Utilities Commission of Ohio required utilities to credit net excess generation at the full retail rate, per DSIRE. In 2002, this exchange was declared illegal by the Ohio Supreme Court and the requirement changed to the utility unbundled generation rate, per DSIRE. This entry therefore records the unbundled rate, not full retail, and no dollar amount.
PUCO amended its rules in 2007, and Senate Bill 221 in 2008 placed a limit on net metering whenever total rated capacity used by customer generators is less than one percent of the provider aggregate peak demand in Ohio, per DSIRE. In November 2017, PUCO amended the rules again, setting a maximum system size at 120 percent of a customer average yearly usage, per DSIRE. The current text is Ohio Administrative Code 4901:1-10-28, effective April 8, 2024.
Who can net meter and how large a system can be
Rule 4901:1-10-28 requires each electric utility to develop a standard net metering tariff and a hospital tariff, available nondiscriminatorily. Except for hospitals, a system must use solar, wind, biomass, landfill gas or hydropower, or a microturbine or fuel cell, per the rule. It must sit on the customer generator premises, and a contiguous lot may count as premises if it creates no unsafe condition, per the rule.
Size is intent based and numeric. The customer generator must intend primarily to offset part or all of its own requirements, per the rule. The utility must assist in calculating requirements from the average supplied annually over the previous three years, or, where data is unavailable due to new construction, vacancy or expansion, establish an appropriate estimate from available data, per the rule.
- Cap: facilities must be sized so as not to exceed 120 percent of requirements at interconnection, whether service is through a utility or a competitive supplier, per the rule.
- Metering: a single meter capable of registering flow in each direction is used, per the rule.
- No feed in charges: the utility may not impose charges relating to electricity the customer generator feeds back, per the rule.
How monthly billing and the surplus credit work
If electricity supplied by the utility exceeds electricity received from the customer generator over the monthly billing cycle, the customer generator is billed for net electricity consumed under normal metering practices, per Rule 4901:1-10-28. That within month netting is the main value, because kilowatt hours netted in the month avoid tariff charges that would otherwise apply.
Only the monthly surplus becomes money, at a narrower rate. On the standard tariff, when the utility receives more than it supplied over the month, the excess is converted to a monetary credit at the energy component of the utility standard service offer, per the rule. The credit continuously carries forward on future bills, the utility need not pay it other than as a bill credit, and it may be lost if unused or if service stops, per the rule. Competitive suppliers differ: a competitive retail electric service provider may offer a contract at any price, rate, credit or refund for excess generation, and is not required to offer one, per the rule. Confirm your arrangement and current tariff before valuing exports.
Compare the quotes this program affects
An incentive only counts when it is named, in writing, in a quote. Line up the quotes you collect in the quote comparison worksheet and check each installer in the national installers directory.