Surplus generation is credited at a percentage of the retail rate under a tiered framework. Customers who sign up under Tier 4 keep that rate for 20 years at the location where the system was installed, per the PUCN page.
NevadaNet metering75% of retail rateTier 4
Independent directory, no paid listings
We are not paid by any installer or program listed here. There are no sponsored placements and no affiliate links. This directory is a free tool to help you compare your options. Listings are ordered by state, then alphabetically by program name, and payment does not affect that order.
Full record for this entry
| Program name | Nevada net metering (Tier 4) |
|---|---|
| State | Nevada |
| Program type | Net metering |
| Administering body | Public Utilities Commission of Nevada (PUCN) and NV Energy |
| Status as the source states it | Tier 4 is open, with no capacity limit for Tier 4, per the PUCN net metering page. The PUCN page was last updated October 15, 2026. |
| What it covers | Surplus generation is credited at a percentage of the retail rate under a tiered framework. Customers who sign up under Tier 4 keep that rate for 20 years at the location where the system was installed, per the PUCN page. |
| Incentive amount note | The PUCN publishes the Tier 4 credit as 75% of the retail rate. That percentage, not a fixed cents figure, is the amount recorded here. |
| Tags | Nevada, Net metering, 75% of retail rate, Tier 4 |
| Official source | Public Utilities Commission of Nevada, Net Metering in Nevada |
| Checked date | 2026-11-01 |
Source note: PUCN net metering page read on 2026-10-15 and re-read on 2026-10-18; the page still shows its own last update as October 15, 2026, with Tier 4 open at 75% of the retail rate and no capacity limit. Re-checked on 2026-10-22. Profile sections were added on 2026-10-26 from the official source above and the official pages cited in the text; every figure is attributed where it appears. Program terms change. Confirm the current status, eligibility and value for your address in the source above and in your utility tariff before you sign anything.
About this program: how it works
How net metering credits work in Nevada
The Public Utilities Commission of Nevada states that net metering lets customers use energy from their leased or purchased solar system to offset their monthly bill, and that excess energy is pushed back onto the grid for other customers. Credits for that excess are recorded on the bill and automatically applied in the next period in which the customer consumes more than they produced, per the PUCN page.
The PUCN states that, effective June 15, 2017, Nevadans who net meter fall under a rate structure set by the Legislature in Assembly Bill 405, for systems of not more than 25 kilowatts, typical of a home or small business rooftop system. Net metering customers stay in the same customer class as other customers, cannot be charged a different fee, and pay the same basic service charge, per the PUCN.
The four tiers, and how a tier fills and closes
Per the PUCN page, the tiers are signup tranches, not usage bands. A tier stays open until combined applied for and installed capacity at that tier equals 80 megawatts, then the rate steps down. The PUCN lists Tier 1 at 95 percent of the retail rate from June 15, 2017, reaching 80 megawatts in August 2018, Tier 2 at 88 percent, opened August 2018 and closed June 2019, and Tier 3 at 81 percent, opened June 2019 and closed June 2020.
The PUCN defines the retail rate as the Base Tariff General Rate, the Base Tariff Energy Rate, and the Deferred Energy Accounting Adjustment Rate combined. The percentage can stay fixed while its cents value moves with those retail rates.
- Tier 1: 95 percent of retail, closed. Tier 2: 88 percent, closed, per the PUCN.
- Tier 3: 81 percent, closed. Tier 4: 75 percent, open, per the PUCN.
Tier 4 today: 75 percent of retail, with no capacity limit
The PUCN states that the rate fell to 75 percent of retail after Tier 3 capacity equaled 80 megawatts, that there is no capacity limit for Tier 4, and that the rate will remain 75 percent unless modified by legislative action. Tier 4 does not close at a benchmark, so a new customer signs up under Tier 4 without a tranche deadline.
The PUCN capacity table, last updated October 15, 2026 per the page, lists Tier 4 as open with 3.400 megawatts applied and 760.476 megawatts installed, a total of 763.876 megawatts, and notes that figures fluctuate as applications change. For a new quote, use the 75 percent percentage on current retail components, not a cents figure from an older proposal.
The 20 year rate lock at the installed location
The PUCN states for each tier that customers keep their signup rate for 20 years at the location where the system was originally installed, and repeats that term for Tier 4. The lock attaches to the location and tier, not to a statewide rate that resets yearly.
A home that signed up under an earlier, higher tier carries that percentage for its 20 year term, while a new installation elsewhere starts at Tier 4. When comparing Nevada homes with solar, ask for the tier, signup date, and remaining years for that address, and confirm them against the interconnection record.